- Power Post Piers — 4 eaFour adjustable metal power post jacks, each set on a new poured concrete footing, installed under the new beam at the foyer hallway — the foyer hallway floor is carried by the new beam instead of dropping.
- Support Beam — built-up (3) 2x8, 18 linear ftA new built-up three (3) 2x8 support beam in one continuous 18 linear ft run, installed under the foyer hallway floor framing and carried by the four new power post piers — the load is taken off the dropped hallway framing.
Scope: installation of four (4) adjustable power post piers/jacks, each set on a new poured concrete footing, under a new built-up three (3) 2x8 support beam — one continuous 18 linear ft run — installed under the foyer hallway floor framing and carried by those piers. The supports carry the foyer hallway floor; no lifting or leveling of the floors is performed as part of this scope.
Notes: the work is under the floor — nothing comes up through your floors for the beam or the piers. Jobsite will be left clean once completed. The crawl space is not a storage area during the work — please remove anything you keep down there before we start. Contractor is not responsible for damage caused inside the home while working in the crawl space.
Strong Post Jacks are adjustable supports. As part of your installation, we provide complimentary adjustments at the 6-month, 12-month, and 18-month anniversaries of the installation date. These follow-up visits are necessary to ensure the jacks settle properly and are fully accepted by your home's structure. Please note that it is your responsibility to contact us to schedule these adjustment service calls. Staying on top of this schedule is important to achieve maximum lift and ensure the long-term stabilization of your floors where this system has been installed.
Warranty: 12 months workmanship on the work performed; 2 years stabilization guaranteed on the repaired supports.
Not included: leveling or lifting of the floors beyond the support work above (this is a support scope); clean-out, debris removal or haul-away; no vapor barrier, encapsulation or dehumidifier; no floor insulation; no drainage or exterior waterproofing work — no trench drain, no sump pump, no discharge line, no french drain, no exterior grading; no sealing of the foundation vents; no crawlspace access or doors; no repair of the joists, subfloor or sills beyond the beam and piers listed; no mold or fungus treatment; no electrical work; no plumbing repair; no permits; any work not listed in the scope above.
Payment: Total Project Cost $5,792.64 · 10% Customer Discount −$579.26 · Total $5,213.38 · Deposit to schedule $2,606.69 · Final payment $2,606.69.
Validity: this estimate is valid until October 12, 2026.
- Leveling or lifting of the floors beyond the support work
- Clean-out, debris removal or haul-away
- Vapor barrier, encapsulation or dehumidifier
- Floor insulation · sealing the foundation vents
- Drainage or exterior waterproofing
- Crawlspace access or doors
- Joist, subfloor or sill repair beyond the beam and piers
- Mold or fungus treatment · HVAC duct work
- Electrical or plumbing · permits
- Any work not listed in the scope above